■ Provision of process equipment for process train No. 5 at gas treatment unit 31, Achimovsky deposits of the Urengoy oil-gas condensate field, JSC Achimgas;
■ Provision of process equipment for gas treatment unit 41 (process trains No. 1, 2) at site 4А, Achimovsky deposits of the Urengoy oil-gas condensate field;
■ Development of design documentation (DD) for natural gas process equipment for the Ob LNG plant;
■ Development of design documentation (DD) for natural gas process equipment for Vysotsk LNG terminal. 1.14 million t LNG/year line;
■ Design and provision of process equipment for the site “Development of the ACh51 bed of the Urengoy field (Samburgsky)”;
■ Development of design documentation for process equipment for the site “Development of the Salmanovsky (Utrennyy) oil-gas condensate field”;
■ Methanol regeneration unit at the Yuzhno-Tambeysky gas condensate field;
■ Gas and gas condensate treatment plant at the Vostochno-Urengoysky license block;
■ Pumping/heating station, condensate deethaniziser plant, booster compressor station for the Samburgsky oil-gas condensate field, JSC ARKTICGAS;
■ Pumping/heating station and condensate deethaniziser plant for the Urengoy oil-gas condensate field, JSC ARKTICGAS;
■ Pumping/heating station and condensate deethaniziser plant for the Urengoy oil-gas condensate field, JSC ARKTICGAS;
■ Pumping/heating station and oil treatment facilities for the Yaro-Yakhinskiy oil-gas condensate field, JSC ARKTICGAS;
■ Provision of process equipment for process train No. 6 at gas treatment unit 31, Achimovsky deposits of the Urengoy oil-gas condensate field, JSC Achimgas;
■ Gas and gas condensate treatment plant at the Kazan oil-gas condensate field, JSC Tomskgazprom;
■ Associated gas disposal (350 million m3/year) for the Verkh-Tarsky field, JSC TNK-BP;
■ Motor oil recovery unit with a capacity of 50,000 t/year for the Republic of Tajikistan, Kanibadam;
■ Gas treatment plant at the Kirinsky gas condensate field;
■ Associated gas disposal unit for the Verkh-Tarsky field (TNK-BP);
■ Development of engineering documents for the “Flow diagram of the production and transportation of formation products for the Zhdanov field”. Zhdanov-A stationary platform;
■ Associated gas treatment plant with a capacity of 100,000 m3/day for the Dolinnoye and Aksaz field (Aktau, Republic of Kazakhstan);
■ Associated gas processing plant for the Akshabulak field (Republic of Kazakhstan);
■ Gas treatment plant with a capacity of 9 billion m3/year for the Nakhodka gas field, LLC Lukoil — Western Siberia;
■ Fuel gas system (FGS-2) at the Krasnodarskaya compressor plant;
■ Development of design documents for gas treatment and adsorption dehydration equipment for the construction of the gas pipeline from Dzuarikau to Tskhinvali;
■ Development of design documents for process equipment and PCS, design supervision of process equipment production for the gas adsorption dehydration unit for “Pipeline DN 1420 Malay,” Bagtyjalyk (Turkmenia);
■ Development of design projects for equipment for the “Condensate stabilization unit” (process trains 8–9) at the Surgut Condensate Stabilization Plant.